A careers website redesign checklist and 12-week project plan with owners, milestones and risks. Free spreadsheet and printable checklist.
By the Happydance team. Updated November 2026.
Use this as a working plan, not a poster. Choose an owner for every task, agree the dates in the first week, and review the risks every Monday.
Twelve weeks is a realistic shape for a focused redesign when decisions are made quickly and content is ready. Complex organisations with many brands or languages will need longer, and a platform change adds time. Treat the plan as a starting point and adjust the lengths.
For the wider thinking behind a redesign, read our careers website redesign guide. If you are moving platform, see the migration checklist and the guide to replacing your careers website provider.
Each phase has a clear finish line. Do not start the next phase until the sign-off for the last one is recorded.
| Weeks | Phase | Milestone | Lead role |
|---|---|---|---|
| 1 to 2 | Discover | Goals, baseline and content inventory agreed | Project lead |
| 3 to 4 | Plan | Requirements, structure and platform signed off | Sponsor |
| 5 to 6 | Design | Mobile and desktop designs approved | Design lead |
| 7 to 9 | Build | Templates, content and integrations complete | Technical lead |
| 10 to 11 | Test | Accessibility, speed, journeys and redirects passed | Project lead |
| 12 | Launch | Live, monitored and reviewed at 30 days | Sponsor |
| Risk | How to reduce it | Owner |
|---|---|---|
| Scope grows during the project | Rank requirements, record changes and decide trade-offs openly | Project lead |
| Content is late | Start content in week 1, set deadlines by owner and use a content tracker | Content owner |
| Too many decision makers | Name approvers up front and agree how disagreements are settled | Sponsor |
| Integration surprises | Test the recruiting system connection in week 4, not week 10 | Technical lead |
| Accessibility found late | Set the standard in week 3 and test every template as it is built | Design lead |
| SEO loss at launch | Map and test redirects, keep addresses where possible and monitor search | SEO lead |
| Editors not ready | Train in weeks 8 and 9 and give every editor a practice task | Project lead |
| Launch date fixed too early | Agree what must be done before launch, and what can follow | Sponsor |
| Key person leaves | Document decisions and name a deputy for each role | Project lead |
| Results cannot be proved | Record the baseline in weeks 1 and 2 and agree measures | Analyst |
| Role | Responsibility |
|---|---|
| Sponsor | Owns the goals and budget. Signs off scope, design and launch. |
| Project lead | Runs the plan, the risks and the weekly meeting. |
| Content owner | Owns copy, stories, imagery and the content migration. |
| Design lead | Owns design, accessibility and the design system. |
| Technical lead | Owns the platform, integrations, speed and security. |
| SEO lead | Owns search, markup, redirects and measurement. |
| Talent acquisition lead | Owns the candidate journey and recruiter needs. |
| Legal and privacy | Reviews consent, privacy and accessibility statements. |
Record sign-offs in writing at five points: goals, scope, design, content and go-live. It prevents the late changes that cost the most.
Customers manage everything themselves, including multilingual content, favicons and basic standard graphics, with no developer needed. We believe that is what a careers website CMS should mean.
Build your skills as you go with the Happydance Academy, and work out whether the project pays back with our business case template.
A checklist is only useful if it matches the size of the project. Match the tier first, then use the phases that apply.
| Tier | Typical phases to use | What you can skip |
|---|---|---|
| Refresh | Discovery, content, test and launch | Replatform and migration steps |
| Rebuild | All phases, with a lighter migration | Contract exit steps |
| Replatform | All phases, including migration and contract exit | Nothing |
Hold a short gate meeting two working days before launch. Each item has an owner, and each owner says go or no-go.
Redesign projects lose time when the same decision is made twice. Keep a one-page log with the decision, the date, who decided and why. Review it at each gate meeting. It also helps the next team understand why the site is built as it is.
A focused project can take about 12 weeks. Multi-brand, multi-language or platform change projects usually take longer.
Agree the goals and a baseline. Without a baseline you cannot prove what changed.
A sponsor, a project lead, and owners for content, design, technology, search and talent acquisition. Add legal and privacy for review.
It depends on whether the platform is the problem. Read the redesign guide and the migration checklist.
Map every old address to a new one, test the redirects and monitor search results after launch.
Yes. Download it, adapt it and use it with your team.
Match the phases to your scope tier. A refresh skips replatform and migration steps, and a replatform uses everything.
A short meeting before launch where each owner confirms their area is ready, with a named rollback plan if something fails.
It stops decisions being repeated, and it explains the reasons behind the site to the next team.