Skip to main content

Posts

Switching Your Careers Website Provider: A 90-Day Plan

90 days to switch: A vendor-neutral plan to change careers website provider safely. Illustrated Happydance cover.
a person wearing glasses smiling
See other posts from by Jim Taylor Managing Director
Guide and checklists

Provider acquired, being retired or simply not delivering? A vendor-neutral 90-day plan to switch your careers website provider without losing traffic, data or applicants.

By Jim Taylor. Updated November 2026.

Why teams switch (and when to act)

Most teams do not choose to change careers website provider. The provider is acquired, a product is retired, a contract comes up for renewal, or the website simply stops keeping pace with the hiring plan.

The good news is that a provider change is a normal, well-understood project. The bad news is that the first few weeks decide whether it goes smoothly, and most of the risk sits in things nobody checks until it is too late: who owns the content, how the URLs will carry over and what happens to the job feed on the day of the switch.

Definition: Careers website provider switch

Moving the careers website from one platform or supplier to another, including the content, the design, the job feed and the application route, while keeping search visibility and applications flowing throughout.

Trigger

The provider was acquired

Roadmaps change after an acquisition. Look for a retirement notice, a forced migration or a price rise at renewal.

Trigger

A product is being retired

If your careers website product has an end of life date, work back from it. A good migration needs at least a quarter.

Trigger

The website is not performing

Slow pages, low applications, hard-to-use editing or a design you cannot change are the most common reasons.

Trigger

The contract is up

A renewal is the best time to ask whether the platform still fits. Notice periods are often 90 days, so check early.

When to act

Start the first-week checklist as soon as any of these triggers appears, even if you are not yet sure you will leave. Protecting your content and data costs a few hours and keeps every option open.

Decide: separate, replace or rebuild?

There are three real options, and the right one depends on where the problem sits. Answer six questions in the tool below for a steer, then read the table.

Free tool

Separate, replace or rebuild?

Six quick questions. Nothing you choose leaves your browser.

If this describes youConsider
Your ATS career page limits design and content, and the ATS is stayingSeparate your careers website from your ATS
The supplier is being retired or you no longer trust itReplace the platform
The platform is fine but the design is tiredRebuild on the current platform

This is the printable version. Switch on JavaScript to use the live calculator in your browser.

OptionBest whenBiggest riskTypical effort
Separate from your ATSThe ATS is staying and the career page is the bottleneckJob feed and application route between the two systemsMedium
Replace the platformThe supplier or product is ending or underperformingURL and content loss without a redirect planHighest
Rebuild in placeThe platform works, the design and content do notTreating a platform problem as a design problemLowest

Our guide to careers website vs ATS career page explains the first option in detail.

First 7 days: read your contract and protect your data

Do these before you tell anyone you are leaving. They cost little, protect your position and keep every option open.

  1. Read the contract. Find the term, renewal date, notice period, price increase cap, and the clauses on termination, transition and data return. Diarise the last date you can give notice.
  2. Check ownership in writing. Confirm you own your content, images, design assets, domain and URLs. If anything is unclear, ask now, in writing.
  3. Request your exports. Ask for a full export of pages, media, translations, forms and consent records. Put the request in writing and note any fee.
  4. Confirm access. Make sure you hold the domain registrar, DNS, analytics, tag manager and Search Console logins, not just the provider.
  5. Capture a baseline. Crawl the whole website, and record traffic, applications, page speed and accessibility results so you can prove the new site is better.

Never let the old site go dark

Plan for the new website to go live while the old one is still running, then retire the old one only after the redirects are proven. A run-off period of 30 to 90 days is common and protects applications.

The easiest migration is the one where you checked who owned everything in week one.

Happydance

Days 8 to 30: scope and select

Use the first month to turn a reaction into a decision. Write down what you need, ask vendors to prove it and decide with evidence.

  • Goals. Write the top three outcomes: for example more applications, faster publishing, better mobile performance or more languages.
  • Must-haves. Keep the list short. Editing without a developer, brand control, applicant tracking system integration, SEO and accessibility are common.
  • Timeline. Work backwards from your end of life or notice date. Give yourself margin.
  • Panel. Include employer brand, talent acquisition operations, an editor, IT or security and procurement.

Run a structured selection with the same questions for every vendor. Our free careers website RFP template has 80 questions, a weighted scorecard and a demo script. If you are earlier in the process, the careers website CMS checklist will help you build a shortlist.

How Happydance does it

Customers manage everything themselves, including multilingual content, favicons and basic standard graphics, with no developer needed. We believe that is what a careers website CMS should mean.

Happydance careers websites are live for brands including Ingram Micro, Criteo, Domino's, National Grid and General Motors. Read how they run theirs in our customer experiences.

Ask every vendor how long migration takes, who does the work, and what a typical customer of your size needs from you. A realistic answer is a few months, not a few weeks, and it depends largely on how fast you approve designs and content.

Days 31 to 60: build and migrate

The middle of the project is where most of the work, and most of the risk, sits. Run the streams in parallel and review them weekly.

  1. DesignTemplates and components in your brand, tested on phones first.
  2. ContentMigrate priority pages, rewrite weak ones and retire the rest.
  3. JobsBuild the job feed and the application route to your ATS.
  4. SEORedirect map, metadata, structured data and sitemaps.
  5. QualityAccessibility, speed and cross-device testing before sign-off.

Content: migrate, rewrite or retire

Content typeDecision ruleWatch for
Top 20 pages by traffic or applicationsMigrate, then improveKeep the URL and the main heading unless there is a strong reason to change
Employee stories and team pagesMigrate and refreshPermissions, photo consent and links to jobs
Old campaign pagesRetire with a redirectDo not leave them as thin, outdated pages
Policy and legal pagesMigrate exactlyWording and dates must be checked by legal
Translated pagesMigrate with mappingKeep hreflang pairs and language switcher links intact

For the technical side of the move, follow our careers website migration checklist. It covers crawling, redirects, staging and post-launch checks in detail.

Job feed continuity

Candidates do not care which system holds the jobs. They care that a job they saw yesterday is still there today. Build and test the feed on staging, run the old and new feeds side by side before launch, and agree how expired jobs are handled so you never serve a dead page that still looks live.

Structured data matters here too: job posting markup, valid dates and a clean sitemap help search engines pick up the new site quickly. See the JobPosting schema guide.

Days 61 to 90: launch, redirect and monitor

Launch is not the finish line. Done well, the switch is invisible to candidates and the following two weeks are about proving it.

  • Staging sign-off from employer brand, talent acquisition, legal and IT.
  • An application submitted end to end on staging, with the ATS receiving the right fields and consent.
  • Redirect map loaded and tested: old URL to the closest new URL, one hop.
  • Accessibility and speed reports meet or beat your baseline.
  • New sitemap submitted, robots.txt checked, canonical tags and hreflang verified.
  • Editors trained and able to publish without help.
  • Holding messages ready for candidates, recruiters and agencies.

Editor training belongs in the launch plan, not after it. For a sense of what structured editor onboarding looks like, the free Happydance CMS Training Course covers the editor in 72 short lessons.

Monitor daily for two weeks

  • Search Console: crawl errors, indexed pages, and impressions for your top 20 pages.
  • Applications: compare daily applications and completion rate with the baseline.
  • Redirects: spot-check the top 50 old URLs every day, and fix any 404 within a day.
  • Speed and accessibility: re-run reports after content changes.
  • Support: note every question from recruiters and candidates, and fix the cause.
30 to 90days to keep the old website or its redirects running after launch
2 weeksof daily monitoring after launch
1:1redirects: every old URL to the closest new page, no chains

What support looks like

Support is Standard (9 to 5, UK and Eastern time) or Elite (24/7), and every request goes through support.happydance.love. Response targets run from 3 hours to 3 days on Standard and from 1 hour to 24 hours on Elite, depending on priority. Every package includes a named customer success manager, a monthly check-in and a quarterly business review. Some customers report getting back up to 40 hours a month. That figure is customer-reported, not an average. See support and service.

Content and URL export checklist

This is the part teams most often skip. Use this list in your first week, and download the full version with owner and date columns below.

  • Every page as HTML or structured text with titles, descriptions and canonical tags.
  • All images and video at original quality, with file names and alt text.
  • All translated versions, with the language pairings.
  • Forms, sign-up lists and consent records, with the wording and date of consent.
  • A full crawl of URLs with traffic, links and rank.
  • Analytics, tag manager and consent set-up.
  • robots.txt, sitemaps, hreflang and structured data in use.
  • Written confirmation of who owns your content, domain and URLs.

What to say to candidates and recruiters

Most switches are invisible to candidates if the redirects and job feed work. Recruiters and hiring managers need more notice because they will notice the editing system, the links and the look.

AudienceWhenWhat to say
Recruiters and hiring managersFour weeks before launch, then one week beforeThe date, what changes, what stays the same and who to ask for help
Candidates mid-applicationOn launch day, if their link changesA short note: "We have refreshed our careers website. Your application is safe. Use this link to continue."
Recruitment agencies and job boardsTwo weeks before launchNew job link formats and the date old links redirect
Employees and referrersOn launch dayA short announcement and the new link for referrals
LeadershipAt each phase gateProgress against the plan and the baseline metrics

Keep messages short, positive and practical. The aim is confidence, not an announcement about the old provider.

How long does it take to replace a careers website provider?

A realistic plan is around 90 days from decision to launch, and it can be quicker for a simple website and slower for a global one with many languages. The biggest variable is how fast your team approves designs and content, and how complex the job feed is.

Will we lose our search rankings if we switch?

You do not have to. Keep your URLs where you can, map every old URL to the closest new page with a one-hop redirect, carry over titles and headings, submit a new sitemap and monitor daily for two weeks. Rankings often dip briefly and then recover or improve if the new website is faster and better.

What if our provider has been acquired or is retiring the product?

Start the first-week checklist straight away, ask for the end of life date and any transition support in writing and work backwards from it. Do not wait for the final notice.

Who owns our careers website content?

It depends on your contract, so check. In most cases you own your own content and images, but the design, templates and code may belong to the provider. Ask for confirmation in writing before you give notice.

Can we keep our applicant tracking system when we change careers website?

Yes. Many teams keep their applicant tracking system for hiring workflow and move the public careers website to a platform built for design, content and search. The job feed and the application route between the two need careful planning and testing.

Should we run the old and new websites side by side?

For a short time, yes. Launch the new website, switch the redirects on and keep the old one available, or at least its redirects, for 30 to 90 days.

What should we ask a new provider about migration?

Ask who does the work, how long it takes, what you need to supply, how redirects are handled, how the job feed is built and tested, and what training your editors receive. Our RFP template includes questions on all of these.

Do we need to tell candidates?

Usually only those mid-application, if their link changes. A short, friendly note is enough. Recruiters, hiring managers and agencies need more notice.

Planning a switch?

Talk to us about moving your careers website. We will walk you through a realistic 90-day plan for your team, in your languages, with your applicant tracking system.

Book a demoSee the CMS

Related Articles